NOTE:
In the future, they will find our new posts www.holz-kraft.de!
Monday, December 14, 2009
Wednesday, December 2, 2009
Hardy Weinberg Lab 8 Problems Number 2
Overview Appointments
The following tour dates will be held in December 2009:
Date: Saturday, 12/05/2009
Time: 09:00 clock-12: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
Date: Monday, 07/12/2009
Time: 15:00 clock-19: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
following Appointment will take place in January 2010:
Date: Monday, 04/01/2010
Time: 15:00 clock-19: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
In 2010, again first Monday of each month
Appointment take place 19:00 clock - on the company release Re ² GmbH in Neufahrn
of 15:00. It's not a separate
registration needed. Once
take place at the customer plant in Freising Braun again
regular inspection visits, we give this
known about the blog.
The following tour dates will be held in December 2009:
Date: Saturday, 12/05/2009
Time: 09:00 clock-12: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
Date: Monday, 07/12/2009
Time: 15:00 clock-19: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
following Appointment will take place in January 2010:
Date: Monday, 04/01/2010
Time: 15:00 clock-19: 00 clock
Location: Spanner RE ² GmbH, Neufahrn
In 2010, again first Monday of each month
Appointment take place 19:00 clock - on the company release Re ² GmbH in Neufahrn
of 15:00. It's not a separate
registration needed. Once
take place at the customer plant in Freising Braun again
regular inspection visits, we give this
known about the blog.
Tuesday, December 1, 2009
Movie Theatre Gropping
Appointment 5:12:09 and topics for thesis
respect, next week, Saturday will not run the system at Brown. We provide either on Friday or the week after 4:12:09 on Monday or Tuesday off. Then it will take certainly a week, until the plant is back on the grid. As compensation, we show you the facilities at our house on Saturday, 05.12.2009. From 9.00 bis 12.00 Clock clock, we'll answer any questions you might have.
At our site we build the next few weeks to several test systems. This is the Big Bertha used and two other facilities that are privately funded. Add to that the system comes from the test stand. In addition to the Abtesten of innovations, it is natural finish in the heat supply to be self-sufficient.
The new analysis - device for measuring the gas timber brings the first values. After this we are incredibly well. As the next step is to be measured only once with a further unit from so that we know whether we're right.
As planned, we will continue to manufacture two installation per month. The plants in December to go to South Tyrol. Damit beliefern wir bereits Land Nummer drei.
An der 40 kW Anlage sind wir die letzten Wochen wieder einen Schritt weitergekommen am Rost. Der Rost für eine 30 kW Holz-Kraft-Anlage muss anders dimensioniert sein wie der Rost für die 40 kW Einheit. Aus unserer Sicht sind wir die letzten 2,5 Jahre schon ein weites Stück gekommen. Und jetzt fängt es an, richtig in die Tiefe zu gehen. Hier eine Zusammenfassung von möglichen Themen für Diplomarbeiten :
HOLZVERGASER
Konzept der Kohlenutzung untersuchen. Die Kohle Nutzung an der Anlage umsetzen. Aufbau einer integrierten Kohleverbrennungseinheit zur Nutzung der Wärme im Anlagenprozeß.
wood gas filter technology - existing wood gas filter technology at the plant. Efficiency of detection, dust after the filter. Re-dimensioning of the filter unit. Improvement suggestions from the field can feed into the review.
create a prototype. Abtesten of development for mass production.
examining the gasification process on generator power. Is there a connection between the stability of the gasification process and the performance by Generator?
examine the influence of humidity on the gasification process.
examine the influence of material composition on the Gasification process.
examine the influence of the dimensions of the wood chips on the gasification process.
relation between methane and tar deposits work out, and make it available for system monitoring and control.
gasification of pellets, optimize the gasifier unit to pellets. Building a pilot plant.
influenced the cortical portion of the silicon content in motor oil and therefore the life of the engine?
efficiency - Investigations, thermal, electrical.
Old wood gasification research knowledge, know-how support the earlier Determine development and make their knowledge available.
distance between the nozzle and grate the beginning: What impact will this have on gasification of wood chips with different qualities.
For the process we blow air into the reactor, which has influence on the process the air and the temperature of the air. Study of the quality of gas as a function of temperature in the entire process.
respect, next week, Saturday will not run the system at Brown. We provide either on Friday or the week after 4:12:09 on Monday or Tuesday off. Then it will take certainly a week, until the plant is back on the grid. As compensation, we show you the facilities at our house on Saturday, 05.12.2009. From 9.00 bis 12.00 Clock clock, we'll answer any questions you might have.
At our site we build the next few weeks to several test systems. This is the Big Bertha used and two other facilities that are privately funded. Add to that the system comes from the test stand. In addition to the Abtesten of innovations, it is natural finish in the heat supply to be self-sufficient.
The new analysis - device for measuring the gas timber brings the first values. After this we are incredibly well. As the next step is to be measured only once with a further unit from so that we know whether we're right.
As planned, we will continue to manufacture two installation per month. The plants in December to go to South Tyrol. Damit beliefern wir bereits Land Nummer drei.
An der 40 kW Anlage sind wir die letzten Wochen wieder einen Schritt weitergekommen am Rost. Der Rost für eine 30 kW Holz-Kraft-Anlage muss anders dimensioniert sein wie der Rost für die 40 kW Einheit. Aus unserer Sicht sind wir die letzten 2,5 Jahre schon ein weites Stück gekommen. Und jetzt fängt es an, richtig in die Tiefe zu gehen. Hier eine Zusammenfassung von möglichen Themen für Diplomarbeiten :
HOLZVERGASER
Konzept der Kohlenutzung untersuchen. Die Kohle Nutzung an der Anlage umsetzen. Aufbau einer integrierten Kohleverbrennungseinheit zur Nutzung der Wärme im Anlagenprozeß.
wood gas filter technology - existing wood gas filter technology at the plant. Efficiency of detection, dust after the filter. Re-dimensioning of the filter unit. Improvement suggestions from the field can feed into the review.
create a prototype. Abtesten of development for mass production.
examining the gasification process on generator power. Is there a connection between the stability of the gasification process and the performance by Generator?
examine the influence of humidity on the gasification process.
examine the influence of material composition on the Gasification process.
examine the influence of the dimensions of the wood chips on the gasification process.
relation between methane and tar deposits work out, and make it available for system monitoring and control.
gasification of pellets, optimize the gasifier unit to pellets. Building a pilot plant.
influenced the cortical portion of the silicon content in motor oil and therefore the life of the engine?
efficiency - Investigations, thermal, electrical.
Old wood gasification research knowledge, know-how support the earlier Determine development and make their knowledge available.
distance between the nozzle and grate the beginning: What impact will this have on gasification of wood chips with different qualities.
For the process we blow air into the reactor, which has influence on the process the air and the temperature of the air. Study of the quality of gas as a function of temperature in the entire process.
Subscribe to:
Posts (Atom)